Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 23 results ...

Akcamete, A (2011) A formal approach for managing facility change information and capturing change history as part of building information models (BIMs), Unpublished PhD Thesis, , Carnegie Mellon University.

Al-Dughaither, K A (1996) International construction financing strategies: Influential factors and decision-making, Unpublished PhD Thesis, , Carnegie Mellon University.

Amekudzi, A (1999) Uncertainty analysis of national highway performance measures in the context of evolving analysis models and data, Unpublished PhD Thesis, , Carnegie Mellon University.

Atasoy, G (2013) Visualizing and interacting with construction project performance information, Unpublished PhD Thesis, , Carnegie Mellon University.

Bello, M A (2012) Minimizing impediments to design for construction safety (DFCS) implementation on capital projects, Unpublished PhD Thesis, , Carnegie Mellon University.

Ben-Alon, L (2020) Natural buildings: Integrating earthen building materials and methods into mainstream construction, Unpublished PhD Thesis, , Carnegie Mellon University.

Coffelt, D P, Jr. (2008) Roof management improvement: Improving infrastructure management decision making through a consideration of total life cycle cost and deterioration, Unpublished PhD Thesis, , Carnegie Mellon University.

Dayanand, N (1996) Scheduling payments in projects: An optimization framework, Unpublished PhD Thesis, , Carnegie Mellon University.

Ergen, E (2005) Formalization of life-cycle data management of engineered-to-order components using advanced tracking technologies, Unpublished PhD Thesis, , Carnegie Mellon University.

Gordon, C (2006) A formalism and a framework for planning of sensor-based construction inspections, Unpublished PhD Thesis, , Carnegie Mellon University.

He, R (2023) Modeling of sustainable materials management systems: Hybrid science-based, data-driven approaches, Unpublished PhD Thesis, , Carnegie Mellon University.

Herabat, P (1997) A functional specification for a decision support system to select bridge analysis tools, Unpublished PhD Thesis, , Carnegie Mellon University.

Kiliccote, H (1997) A standards processing framework, Unpublished PhD Thesis, , Carnegie Mellon University.

Kiziltas, S (2008) An automated approach for developing integrated model-based construction project histories to support estimation of activity production rates, Unpublished PhD Thesis, , Carnegie Mellon University.

Lee, K J (2013) A formal and ontological approach to embed commissioning test protocol into building information model, Unpublished PhD Thesis, , Carnegie Mellon University.

Lee, S H (2009) Computational fieldwork support for efficient operation and maintenance of mechanical, electrical and plumbing systems, Unpublished PhD Thesis, , Carnegie Mellon University.

  • Type: Thesis
  • Keywords: accessibility; efficiency; liability; reliability; automation; building information model; lifecycle; operation and maintenance; experiment
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304858123
  • Abstract:
    There is significant potential for improvement in the performance of Operation and Maintenance (O&M) fieldwork. O&M occurs throughout the lifecycle of a building; the majority of expenses in a building's lifecycle are incurred during O&M. Many strategies have been developed to enhance the O&M environment. However, it is well-known that the maintenance industry adapts new technologies more slowly than other industries. Although the industry's O&M support systems have been enhanced considerably, its overall style of O&M fieldwork has remained essentially unchanged for decades. Furthermore, tradespeople, whose primary roles are O&M fieldwork, vastly underutilize information in the field due to problems with information accessibility and reliability. This research investigates current practices from the initial phase of assigning O&M requests through the completion of the requests in order to identify inefficiency in O&M fieldwork and to develop strategies to improve the environment from the perspective of computational support. As the first step, shadowing tradespeople was conducted to better understand current O&M fieldwork and pinpoint bottlenecks in the workflow. Statistical analyses (F-test, Analysis of Variance and R2-Test) were conducted to see the correlation among O&M activities as well as the similarity of the collected data. An Augmented Reality (AR)-based Operation and Maintenance Fieldwork Facilitator (AROMA-FF) is developed to computationally support O&M fieldwork. An O&M information model is developed by enhancing an existing Building Information Model with the data collected from O&M fieldwork practice. An Augmented Reality-based interface is developed for an intuitive user interface. BACnet protocol is used to get sensor-derived operation data in real time from Building Automation Systems. A series of experiments was conducted in order to quantitatively measure improvement in O&M efficiency by using a software prototype of the AR-based O&M Fieldwork Facilitator. The key metric was time spent on O&M activities. The most impressive finding from the experiment is that while the subjects were trying to locate the target area, they spent, on average, 49% less time with the prototype than conventional strategies in addition to an 8% decrease in time spent getting operation-related data. These results show that the prototype is capable of improving O&M fieldwork efficiency.

Ochoa Franco, L A (2004) Life cycle assessment of residential buildings, Unpublished PhD Thesis, , Carnegie Mellon University.

Pradhan, A R (2009) An approach for fusing data from multiple sources to support construction productivity analyses, Unpublished PhD Thesis, , Carnegie Mellon University.

Reich, Y (1991) Building and improving design systems: A machine learning approach, Unpublished PhD Thesis, , Carnegie Mellon University.

Reinhardt, J (2003) Navigational models for effective and efficient interaction with integrated product and process models on construction sites, Unpublished PhD Thesis, , Carnegie Mellon University.

Resendiz-Carrillo, D (1990) Risk-based framework for the selection of socially optimal dam safety goals, Unpublished PhD Thesis, , Carnegie Mellon University.

Rivard, H (1997) A building design representation for conceptual design and case-based reasoning, Unpublished PhD Thesis, , Carnegie Mellon University.

Sharrard, A L (2007) Greening construction processes using an input-output-based hybrid life cycle assessment method, Unpublished PhD Thesis, , Carnegie Mellon University.